主计划 MPS
周期 W26–W37 · 12 周
MPS v3● 已排产含产能约束

Master 投产计划.

产销平衡率
98.2%
超载周
1
§ 01产线产能占用 · L1 / L2W26–W37
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
正常占用超载(W31 108%,需调平)
§ 02投产矩阵 · 物料 × 周期
● 历史已锁定● 计划期可编辑
物料 W26W27W28 W29W30W31W32W33W34 合计
M-1001 整机A1,2001,2001,2501,3001,3001,4501,2001,1501,10011,150
M-1077 整机B8008208509009509809008808607,940
SF-501 半成品1,5001,5001,6001,7001,7001,8001,6501,6001,55014,600
SF-512 半成品9009209501,0001,0201,0509809609408,720
M-3310 整机C6006106206406506606306206105,640
周合计5,0005,0505,2705,5405,6205,9405,3605,2105,06048,050
标红 = 该周期投产受产能约束(W31 超载已自动后移部分至 W32) 下一步:MRP 物料展开 →